The IPWE  organises Seminars and group discussions so as to have better exchange of knowledge and experience about the latest technology concerning P.Way , Bridges and other Structures. 
The following National/International Technical Seminars were organised by the Institution in the last decade.

 

 Period  Topic  Place Technical Papers
 Aug’2024 (1) Adoption & Implementation of Modern Track Infrastructure for higher speed and heavier axle load. Gandhinagar  Vol-I       Vol-II 
(2) Faster Construction of ROBs & RUBs for elimination of level crossings, Experiences of Railways and way forward.
(3) Fast Track delivery of projects - Successful case Studies.
(4) Planning & Execution of elevated rail corridors (incl. elevated stations) with speed potential of 250 KMPH
Nov’2023 (1)  Rolling Block – Paradigm shift in Inspection and   Maintenance  of Railway Infrastructure.  Pune Vol-I       Vol-II 
(2) Use of Modern Technology & Innovative Techniques in Creation and Upgradation of Railway Infrastructure.
Feb’2023 (1)  Challenges in Maintenance and up gradation of track for traffic Regime of Higher Speed and heavier axle loads.  Kolkata   Vol-I       Vol-II 

Video Recording

    Part - 1  Part-2    Part-3  

(2)   EPC Contracts- Enabling with Project Management System (PMS), Project Supervision Services (PSS) and Project Management Consultancy Services (PMC).
Mar’2022 (1)      Introduction of Higher speed and Higher Axle Loads over Existing Indian Railway Network. Udaipur  
(2) Alternate Financing and process for Accelerated Infrastructure Development over Indian Railway for early delivery of Projects
Feb’2020 (1)  Optimising and improving output of Track Machines during Traffic Blocks. Goa                  Technical Papers
(2)  Accelerated Construction of Doubling Projects.
Feb’2019 Challenges in Introducing Speeds of 160 kmph for Passenger Trains and 100 kmph for high axle load freight trains on IR and Innovation and Technologies for Fast-Paced Construction  Hyderabad

Technical Paper

Feb’2018 Leveraging Development in Monitoring Technology for Optimizing Track, Bridge and Tunnel Maintenance Guwahati

Technical Papers

July’2017 Global Trends in Track Technologies and Fast-Paced Construction. New Delhi  
Feb’2017 Challenges In Design and Maintenance of Track under Mixed Traffic Regime of Semi High Speed and Heavy Axle Load Mumbai

 Papers

Feb’2016 (i)  Design, Construction & Maintenance of Station Yards. New Delhi  
(ii) Accelerated construction of New Lines/Doubling Projects.  - Fast Track Construction of ROBs/RUBs.  
Jan’2015 (i)  Rail/Weld Management: Quality and Reliability  New Delhi  
(ii) Increase of Speed on the Existing Indian Railway Routes  
(iii)Metro Systems: Design, Standards, Construction and Maintenance.   
Jan’2014 (i) Management of P.Way Works through Need Based  Jaipur  
(ii) Design, Construction and Maintenance of Railway Tunnels  
Jan’2013 "Improving the in service reliability of rails and Rail Welds" and  ”Evolving Economical and appropriate Design of Ballastless Track". Chennai  
Jan’2012 Introduction of high Speed through Upgradation of the Existing Tracks and Elimination of Level Crossings. Pune  
Apr’2011 Rail Wheel Interaction in the Context of Heavy Axle Loading and Mechanisation in Construction of Track. Bangalore  
Jan’2010 "Impact and experience of Heavier Axle loads on Indian Railways and resultant Maintenance Strategies" and "Innovation in Design and Construction of Road Over Bridges and Road Under Bridges on the Indian Railways" Pune  
Jan’2009 High Speed Corridors and Higher Speed on existing network. Mumbai  
Feb’2008 Heavier Axle Load - Experiences on Indian Railways in regard to running of Multiple Locos, longer freight trains and its impact on fatigue life of track, bridges & formation. New Delhi  
Jan’2007 Effect of Heavier Axle Load Trains on Track and Bridges. Jaipur  
Jan’2006 Design, Construction, Inspection Rehabilitation and Maintenance of Railway Bridges Chennai  
Jan’2005 Mechanisation of Track Maintenance, Relaying and Construction on I. R. New Delhi  
Jan’2004 Construction and rehabilitation of railway track including formation tunnels and bridges. Kolkata  
Jan’2003 Optimization of track maintenance practices and adoption of latest technology both for machine and manually maintained sections. Pune  
Jan’2001 On-Track Machines their Planning, Deployment and Maintenance. Lucknow  
Dec’2001 Track Standards, formation, ballast and elastic fastenings. Secunderabad  
Sept’2000 Modernization and Maintenance of Track. Guwahati  
Jan’2000 Rails - Manufacture, Testing, Handling and Care. Calcutta  
Jan’1999 Small Track Machines for improving Quality of Track Mumbai  
Dec’1997 Mechanized Track Maintenance New Delhi  
Feb’1997 Railway Accidents & Safety Measures with Special reference to P-Way New Delhi