|
The IPWE organises Seminars and group discussions so as to have better exchange of knowledge and experience about the latest technology concerning P.Way , Bridges and other Structures.
|
|||
| Period | Topic | Place | Technical Papers |
| Aug’2024 | (1) Adoption & Implementation of Modern Track Infrastructure for higher speed and heavier axle load. | Gandhinagar | Vol-I Vol-II |
| (2) Faster Construction of ROBs & RUBs for elimination of level crossings, Experiences of Railways and way forward. | |||
| (3) Fast Track delivery of projects - Successful case Studies. | |||
| (4) Planning & Execution of elevated rail corridors (incl. elevated stations) with speed potential of 250 KMPH | |||
| Nov’2023 | (1) Rolling Block – Paradigm shift in Inspection and Maintenance of Railway Infrastructure. | Pune | Vol-I Vol-II |
| (2) Use of Modern Technology & Innovative Techniques in Creation and Upgradation of Railway Infrastructure. | |||
| Feb’2023 | (1) Challenges in Maintenance and up gradation of track for traffic Regime of Higher Speed and heavier axle loads. | Kolkata | Vol-I Vol-II |
| (2) EPC Contracts- Enabling with Project Management System (PMS), Project Supervision Services (PSS) and Project Management Consultancy Services (PMC). | |||
| Mar’2022 | (1) Introduction of Higher speed and Higher Axle Loads over Existing Indian Railway Network. | Udaipur | |
| (2) Alternate Financing and process for Accelerated Infrastructure Development over Indian Railway for early delivery of Projects | |||
| Feb’2020 | (1) Optimising and improving output of Track Machines during Traffic Blocks. | Goa | Technical Papers |
| (2) Accelerated Construction of Doubling Projects. | |||
| Feb’2019 | Challenges in Introducing Speeds of 160 kmph for Passenger Trains and 100 kmph for high axle load freight trains on IR and Innovation and Technologies for Fast-Paced Construction | Hyderabad | |
| Feb’2018 | Leveraging Development in Monitoring Technology for Optimizing Track, Bridge and Tunnel Maintenance | Guwahati | |
| July’2017 | Global Trends in Track Technologies and Fast-Paced Construction. | New Delhi | |
| Feb’2017 | Challenges In Design and Maintenance of Track under Mixed Traffic Regime of Semi High Speed and Heavy Axle Load | Mumbai | |
| Feb’2016 | (i) Design, Construction & Maintenance of Station Yards. | New Delhi | |
| (ii) Accelerated construction of New Lines/Doubling Projects. - Fast Track Construction of ROBs/RUBs. | |||
| Jan’2015 | (i) Rail/Weld Management: Quality and Reliability | New Delhi | |
| (ii) Increase of Speed on the Existing Indian Railway Routes | |||
| (iii)Metro Systems: Design, Standards, Construction and Maintenance. | |||
| Jan’2014 | (i) Management of P.Way Works through Need Based | Jaipur | |
| (ii) Design, Construction and Maintenance of Railway Tunnels | |||
| Jan’2013 | "Improving the in service reliability of rails and Rail Welds" and ”Evolving Economical and appropriate Design of Ballastless Track". | Chennai | |
| Jan’2012 | Introduction of high Speed through Upgradation of the Existing Tracks and Elimination of Level Crossings. | Pune | |
| Apr’2011 | Rail Wheel Interaction in the Context of Heavy Axle Loading and Mechanisation in Construction of Track. | Bangalore | |
| Jan’2010 | "Impact and experience of Heavier Axle loads on Indian Railways and resultant Maintenance Strategies" and "Innovation in Design and Construction of Road Over Bridges and Road Under Bridges on the Indian Railways" | Pune | |
| Jan’2009 | High Speed Corridors and Higher Speed on existing network. | Mumbai | |
| Feb’2008 | Heavier Axle Load - Experiences on Indian Railways in regard to running of Multiple Locos, longer freight trains and its impact on fatigue life of track, bridges & formation. | New Delhi | |
| Jan’2007 | Effect of Heavier Axle Load Trains on Track and Bridges. | Jaipur | |
| Jan’2006 | Design, Construction, Inspection Rehabilitation and Maintenance of Railway Bridges | Chennai | |
| Jan’2005 | Mechanisation of Track Maintenance, Relaying and Construction on I. R. | New Delhi | |
| Jan’2004 | Construction and rehabilitation of railway track including formation tunnels and bridges. | Kolkata | |
| Jan’2003 | Optimization of track maintenance practices and adoption of latest technology both for machine and manually maintained sections. | Pune | |
| Jan’2001 | On-Track Machines their Planning, Deployment and Maintenance. | Lucknow | |
| Dec’2001 | Track Standards, formation, ballast and elastic fastenings. | Secunderabad | |
| Sept’2000 | Modernization and Maintenance of Track. | Guwahati | |
| Jan’2000 | Rails - Manufacture, Testing, Handling and Care. | Calcutta | |
| Jan’1999 | Small Track Machines for improving Quality of Track | Mumbai | |
| Dec’1997 | Mechanized Track Maintenance | New Delhi | |
| Feb’1997 | Railway Accidents & Safety Measures with Special reference to P-Way | New Delhi | |